Filter: Research
Name | Type | Location | Phase | Surface | Year | ||
---|---|---|---|---|---|---|---|
Mines ParisTech Innovation Campus | Higher education, Research, Public equipment | Versailles Satory | Construction site | 23 300 m2 | 2019 – 2024 | → |
|
Neuroscience Research Centre | Higher education, Research, Animalerie | Saclay | Completed | 16 700 m2 | 2013 – 2020 | → |
|
Institute for Climate and Environmental Research | Higher education, Research | Saint-Aubin | Completed | 9 675 m2 | 2013 – 2018 | → |
|
Insectarium – Extension of the IBMC | Higher education, Research, Animalerie | Strasbourg | Completed | 1 500 m2 | 2018 | → |
|
Agro ParisTech campus on the Saclay plateau | Higher education, Research | Palaiseau | Completed | 64 300 m2 | 2015 – 2017 | → |
|
European Centre for Biotechnology and Bioeconomy (CEBB) | Higher education, Research | Pomacle | Completed | 3 100 m2 | 2015 | → |
|
Extension de l'Université – Bâtiment de recherche en nanotechnologies | Higher education, Research, Public equipment | Troyes | Completed | 5 200 m2 | 2011 – 2015 | → |
|
Pôle de compétitivité E=MC² Technocampus | Higher education, Research, Industry | Bouguenais | Competition | 26 700 m2 | 2006 – 2007 | ||
Restructuration du site du CNRS à Thiais, accueil d'une nouvelle Unité de recherche | Research | Thiais | Completed | 3 000 m2 | 2006 – 2008 | ||
Halle de Microtechnologies | Research, Clean rooms | Le Mans | Completed | 894 m2 | 2006 – 2009 | → |
|
Restructuration du Centre de Recherche INSERM (Virologie / Ultrasons / zones confinées L2 et L3) | Research, Animalerie | Lyon | Completed | 3 500 m2 | 2006 – 2009 | ||
Création du Pharmatechnopole et restructuration de l'Université | Higher education, Research, Public equipment | Châtenay-Malabry | Completed | 7 400 m2 | 2007 – 2014 | ||
Aménagement de locaux de recherche universitaire de biologie dans la barre Cassan A4 | Higher education, Research, Public equipment | Paris | Completed | 500 m2 | 2008 – 2009 | → |
|
Relogement des Chimistes de recherche dans la barre Cassan F | Higher education, Research, Public equipment | Paris | Completed | 2 300 m2 | 2008 – 2010 | ||
Centre de Biologie Intégrative | Research | Illkirch-Graffenstaden | Completed | 4 500 m2 | 2009 – 2013 | → |
|
Institut de Recherche Biomédicale des Armées (IRBA) | Research, Health, Laboratoires | Brétigny-sur-Orge | Competition | 24 200 m2 | 2010 | ||
Hub de laboratoires de recherche sur le stockage de l'énergie | Higher education, Research | Amiens | Competition | 6 700 m2 | 2011 – 2012 | → |
|
Centre de recherche sur les bioprocédés de l’environnement | Research | Antony | Competition | 600 m2 | 2011 – 2012 | ||
Pôle à Risques Biologiques de l'Ecole Nationale Vétérinaire d'Alfort | Higher education, Research, Public equipment | Maisons-Alfort | Competition | 3 800 m2 | 2011 | → |
|
Centre de recherche dans le domaine de la Santé (IRIS2) | Research, Health | Angers | Competition | 2 600 m2 | 2011 – 2012 | → |
|
Institut d'optoélectronique et plateforme d'innovation Lafayette - Georgia Tech | Higher education, Research, Clean rooms | Metz | Competition | 3 000 m2 | 2011 | → |
|
Centre de recherche et développement sur la sécurité des aliments | Research, Industry | Saint-Lô | Competition | 2 400 m2 | 2012 | ||
Construction d'un centre de nanosciences et de nanotechnologies sur le plateau de Saclay | Higher education, Research | Palaiseau | Competition | 20 000 m2 | 2012 | → |
|
Usine école EASE pour les métiers de la production en salles blanches | Higher education, Research, Public equipment | Illkirch | Competition | 6 600 m2 | 2012 | ||
Regroupement des animaleries de l'IMRB | Research, Animalerie | Créteil | Completed | 1 100 m2 | 2012 – 2017 | ||
Institut de Recherche en Santé, Environnement et Travail (IRSET) | Research | Rennes | Competition | 8 600 m2 | 2012 | → |
|
Animalerie provisoire sur le campus universitaire de Jussieu | Research, Animalerie | Paris | Competition | 1 000 m2 | 2013 | ||
Pôle FARN-formation sur le CNPE du Bugey | Research | Lagnieu | Competition | 6 660 m2 | 2013 | ||
Extension de l'Ecole Supérieure d'Ingénieurs en Travaux de la Construction (ESITC) de Caen | Higher education, Research | Epron | Competition | 4 700 m2 | 2013 | ||
Construction d'un pôle agro-alimentaire | Research | Poligny | Competition | 1 500 m2 | 2013 | → |
|
Pôle de l'innovation et de l'entreprenariat technologiques | Higher education, Research | Villetaneuse | Construction site | 2 880 m2 | 2013 – 2015 | ||
Réhabilitation et construction de bureaux neufs | Higher education, Research | Villeurbanne | Competition | 5 100 m2 | 2014 | ||
Restructuration du bâtiment universitaire Chevreul (Chimie) | Higher education, Research | Villeurbanne | Completed | 4 600 m2 | 2014 – 2018 | → |
|
Extension et réhabilitation du laboratoire Aimé Cotton de l'Université Paris Sud | Higher education, Research | Orsay | Competition | 3 600 m2 | 2014 | → |
|
Bâtiment pour le LASEM sur le site de Mesdoun | Research, Health | Brest | Competition | 2 400 m2 | 2014 | ||
Restructuration de l'Institut de Physiologie et de Chimie Biologique (IPCB) | Higher education, Research, Public equipment | Strasbourg | Competition | 3 400 m2 | 2015 | ||
Contrat de promotion immobilière pour l'implantation du Cluster Mobilité du Futur | Research, Office, Industry | Versailles | Competition | 7 400 m2 | 2015 | ||
Réalisation du projet FEERIX en extension des locaux du CRITT Aérial | Research | Illkirch-Graffenstaden | Competition | 800 m2 | 2016 | ||
Construction de BIO INNOVATION | Research, Office | Besançon | Competition | 4 200 m2 | 2016 | → |
|
Bâtiment à usage de recherche, de transfert technologique, de formation et d'animation | Research | Toulouse | Preliminary design | 3 645 m2 | 2016 | ||
Techno-centre du machinisme agricole et des agroéquipements | Research, Industry | Beauvais | Competition | 2 100 m2 | 2017 | ||
Construction de la deuxième tranche de l'Institut du Littoral | Higher education, Research, Public equipment | La Rochelle | Construction site | 2 600 m2 | 2017 – 2023 | ||
Implantation de TWB sur le campus de l'INSA de Toulouse | Higher education, Research, Public equipment | Toulouse | Competition | 3 500 m2 | 2017 | ||
Bâtiment pour la production commerciale de produits vracs de Thérapie Génique | Research, Industry | Evry | Competition | 5 000 m2 | 2017 | ||
Nouveau bâtiment des neurosciences de l'hôpital Sainte-Anne | Research, Health, Public equipment | Paris | Competition | 15 000 m2 | 2018 – 2019 | ||
Ensemble immobilier "Chimie, Matériaux, Procédés" | Higher education, Research, Public equipment | Toulouse | Competition | 13 000 m2 | 2018 – 2019 | ||
Restructuration de 2 bâtiments pour l'installation des Laboratoires de Physique de Montpellier (LMP) | Higher education, Research, Public equipment | Montpellier | Competition | 9 000 m2 | 2018 | ||
Réhabilitation des blocs 3 et 4 de l'IGH TPR2 | Higher education, Research, Animalerie | Marseille | Competition | 11 000 m2 | 2019 – 2020 | ||
Projet GenoSafe au Parc 2000 | Research, Office, Clean rooms | Evry-Courcouronnes | Preliminary design | 2 600 m2 | 2019 – 2023 | ||
Construction d'un bâtiment dédié à l'école d'ingénieurs Isalab à Anglet / Projet Cœur de Campus | Higher education, Research, Public equipment | Anglet | Competition | 5 500 m2 | 2019 – 2020 | → |
|
Projet Hydropolis-Recherche – Campus Pharmacie | Higher education, Research, Public equipment | Montpellier | Competition | 3 300 m2 | 2020 | ||
Nouveau bâtiment d'enseignement supérieur pour les départements GIM et GEII de l'IUT | Higher education, Research, Public equipment | Toulon | Competition | 5 400 m2 | 2020 | → |
|
Pôle AgroBiosciences, laboratoires, serre expérimentale et amphithéâtre sur le Campus de l'INRA | Higher education, Research, Public equipment | Toulouse | Construction site | 3 600 m2 | 2016 – 2022 | ||
Revitalisation du cœur de Campus de l’Ecole Spéciale des Travaux publics | Higher education, Research, Sports | Cachan | Competition | 10 700 m2 | 2022 – 2022 | → |
|