Filter: Higher education
Name | Type | Location | Phase | Surface | Year | ||
---|---|---|---|---|---|---|---|
Mines ParisTech Innovation Campus | Higher education, Research, Public equipment | Versailles Satory | Construction site | 23 300 m2 | 2019 – 2024 | → |
|
Neuroscience Research Centre | Higher education, Research, Animalerie | Saclay | Completed | 16 700 m2 | 2013 – 2020 | → |
|
Institute for Climate and Environmental Research | Higher education, Research | Saint-Aubin | Completed | 9 675 m2 | 2013 – 2018 | → |
|
Insectarium – Extension of the IBMC | Higher education, Research, Animalerie | Strasbourg | Completed | 1 500 m2 | 2018 | → |
|
Agro ParisTech campus on the Saclay plateau | Higher education, Research | Palaiseau | Completed | 64 300 m2 | 2015 – 2017 | → |
|
European Centre for Biotechnology and Bioeconomy (CEBB) | Higher education, Research | Pomacle | Completed | 3 100 m2 | 2015 | → |
|
Extension de l'Université – Bâtiment de recherche en nanotechnologies | Higher education, Research, Public equipment | Troyes | Completed | 5 200 m2 | 2011 – 2015 | → |
|
Pôle de compétitivité E=MC² Technocampus | Higher education, Research, Industry | Bouguenais | Competition | 26 700 m2 | 2006 – 2007 | ||
Création du Pharmatechnopole et restructuration de l'Université | Higher education, Research, Public equipment | Châtenay-Malabry | Completed | 7 400 m2 | 2007 – 2014 | ||
Aménagement de locaux de recherche universitaire de biologie dans la barre Cassan A4 | Higher education, Research, Public equipment | Paris | Completed | 500 m2 | 2008 – 2009 | → |
|
Relogement des Chimistes de recherche dans la barre Cassan F | Higher education, Research, Public equipment | Paris | Completed | 2 300 m2 | 2008 – 2010 | ||
Hub de laboratoires de recherche sur le stockage de l'énergie | Higher education, Research | Amiens | Competition | 6 700 m2 | 2011 – 2012 | → |
|
Pôle à Risques Biologiques de l'Ecole Nationale Vétérinaire d'Alfort | Higher education, Research, Public equipment | Maisons-Alfort | Competition | 3 800 m2 | 2011 | → |
|
Pôle d’excellence en Communication, Image numérique et Informatique Décisionnelle | Higher education, Public equipment | Bron | Competition | 3 000 m2 | 2012 | ||
Institut d'optoélectronique et plateforme d'innovation Lafayette - Georgia Tech | Higher education, Research, Clean rooms | Metz | Competition | 3 000 m2 | 2011 | → |
|
Construction d'un centre de nanosciences et de nanotechnologies sur le plateau de Saclay | Higher education, Research | Palaiseau | Competition | 20 000 m2 | 2012 | → |
|
Usine école EASE pour les métiers de la production en salles blanches | Higher education, Research, Public equipment | Illkirch | Competition | 6 600 m2 | 2012 | ||
Extension de l'Ecole Supérieure d'Ingénieurs en Travaux de la Construction (ESITC) de Caen | Higher education, Research | Epron | Competition | 4 700 m2 | 2013 | ||
Réalisation d'un centre de santé publique et de sécurité sanitaire des aliments | Higher education, Health | Nantes | Completed | 1 200 m2 | 2013 – 2015 | ||
Pôle de l'innovation et de l'entreprenariat technologiques | Higher education, Research | Villetaneuse | Construction site | 2 880 m2 | 2013 – 2015 | ||
Réhabilitation et construction de bureaux neufs | Higher education, Research | Villeurbanne | Competition | 5 100 m2 | 2014 | ||
Restructuration du bâtiment universitaire Chevreul (Chimie) | Higher education, Research | Villeurbanne | Completed | 4 600 m2 | 2014 – 2018 | → |
|
Extension et réhabilitation du laboratoire Aimé Cotton de l'Université Paris Sud | Higher education, Research | Orsay | Competition | 3 600 m2 | 2014 | → |
|
Hôpital universitaire | Higher education, Health | Ho Chi Min Ville, Vietnam | Work in progress | 90 000 m2 | 2015 | → |
|
Restructuration de l'Institut de Physiologie et de Chimie Biologique (IPCB) | Higher education, Research, Public equipment | Strasbourg | Competition | 3 400 m2 | 2015 | ||
Construction de la deuxième tranche de l'Institut du Littoral | Higher education, Research, Public equipment | La Rochelle | Construction site | 2 600 m2 | 2017 – 2023 | ||
Implantation de TWB sur le campus de l'INSA de Toulouse | Higher education, Research, Public equipment | Toulouse | Competition | 3 500 m2 | 2017 | ||
Ensemble immobilier "Chimie, Matériaux, Procédés" | Higher education, Research, Public equipment | Toulouse | Competition | 13 000 m2 | 2018 – 2019 | ||
Restructuration de 2 bâtiments pour l'installation des Laboratoires de Physique de Montpellier (LMP) | Higher education, Research, Public equipment | Montpellier | Competition | 9 000 m2 | 2018 | ||
Réhabilitation des blocs 3 et 4 de l'IGH TPR2 | Higher education, Research, Animalerie | Marseille | Competition | 11 000 m2 | 2019 – 2020 | ||
Extension de l'ESPE Meinau en vue de la création d'un pôle de formation | Higher education, Public equipment | Strasbourg | Preliminary design | 2 600 m2 | 2019 – 2023 | → |
|
Construction d'un bâtiment dédié à l'école d'ingénieurs Isalab à Anglet / Projet Cœur de Campus | Higher education, Research, Public equipment | Anglet | Competition | 5 500 m2 | 2019 – 2020 | → |
|
Reconstruction et restructuration du CREPS | Higher education, Public equipment, Sports | Chatenay-Malabry | Competition | 6 500 m2 | 2020 | ||
Projet Hydropolis-Recherche – Campus Pharmacie | Higher education, Research, Public equipment | Montpellier | Competition | 3 300 m2 | 2020 | ||
Nouveau bâtiment d'enseignement supérieur pour les départements GIM et GEII de l'IUT | Higher education, Research, Public equipment | Toulon | Competition | 5 400 m2 | 2020 | → |
|
Pôle AgroBiosciences, laboratoires, serre expérimentale et amphithéâtre sur le Campus de l'INRA | Higher education, Research, Public equipment | Toulouse | Construction site | 3 600 m2 | 2016 – 2022 | ||
Revitalisation du cœur de Campus de l’Ecole Spéciale des Travaux publics | Higher education, Research, Sports | Cachan | Competition | 10 700 m2 | 2022 – 2022 | → |
|